RESIDENTIAL

New construction housing, Comprehensive reforms, ...

PUBLIC ATTENDANCE

Theaters, Auditoriums, Multiple Use Rooms, ...

EDUCATIONAL

Schools, Libraries, Music Schools, Rehearsal rooms,...

INDUSTRY

Industrial buildings, Representative Offices,...

Efficient and reliable management during all the phases of its life cycle saves costs and time.

BIM methodology

Analysis

This phase represents the first step in the life cycle of a construction project and also in the implementation of the BIM methodology. It is in this stage prior to construction that the greatest amount of information associated with our asset is generated.

design

BIM allows to know in this phase what will be the behavior of the building once built, its energy impact and sustainability.

construction

The construction phase represents the commissioning of the project. In this phase it is important to carry out exhaustive monitoring of the expected evolution of the building and avoid blockages in the building process.

maintenance

Having all the documentation and information of the building allows exhaustive management of the facilities throughout the life cycle of the building and anticipate any maintenance operation.

can lis

“Architecture is based on science as much as on intuition, and if you want to be an architect you must have control of technology in order to develop their own ideas, in order to later show that the intuition is correct, and in order to build your own dreams»

Jorn Utzon

ARQUISON

STUDIO OF ARCHITECTURE AND ACOUSTIC ENGINEERING

RESIDENTIAL

– Piles Beach

– La Cañada – Paterna

– Vilamarxant

–Albuixec

–Godella

– Son Bielo – Llucmajor – Balearic Islands

SPECTATORS

– Dénia

- Alginet

– Salt – Girona

– Montitxelvo

– Rocafort

– Ciutadella de Menorca

vhouse single family home

arquison architecture

Half technology half ideas, 100% dreams.
TECHNOLOGY 0
IDEAS 0
DREAMS 0

ACOUSTIC STUDIES

VISIT OUR PORTFOLIO


ARCHITECTURAL ACOUSTICS
ARCHITECTURE – ENGINEERING